Delay
- From 1 to 2 months to complete the articles and conditions of sale of your house and to have an final plan and an estimate.
- 2 months minimum for the planning permission.
- 1 month of delivery for the materials on the building site.
- 2 months of assembly (neither kit, nor preparation, so a real building).
Consequently, the total time is about 6 or 7 months.
Type of building
- Lumber treated beams in spruce, double thickness for an insulation sandwich
- Exterior facing with undressed treated wainscot.
- Hardwood floor in pine - pine plinth
Price of a building (if achievable)
- Plan (if not standard): 5200 €
- Foundation and connecting: to be done by our local mason
- Materials: depending on the model (cf board)
- Delivery : depends on the model and the location, contact us concerning the transfer of the cadastral plans.
- Assembly: depends on the model, (cf board)
- Decoration and finition : painting, tiling, carpet not included. This finition are to add if you want these items. Please, see the options board.
The bathroom
- 1,80m (length) x 1,80m (wide) in standard when there is one door, bath , toilets, basin, or 2,40m (length) x 1,80m (wide) with 2 doors.
Illustrations
- Pictures in 3D: on our web site or creation of your own model
- plan in 2D: in the software Word we made them adjustable for a change (dimensions…), on the request of your plan.
- Pictures for some details : on your request
- 3D and 2D plans: when you get your planning permission after tthe signature of the contract.
Possibilies for the building
- kit: no, we don’t make it
- undressed materials: yes
- your house with immediate entry : yes
- customized house : yes, on request and after study
- furnished and decorated : yes on requirement and after study
|